Environmental consulting · LCRM Stage 1

Tier 1 AutoReport

Drafts LCRM Stage 1 (Tier 1) preliminary risk assessment desk study reports from Envirocheck or Groundsure data. A competent assessor reviews, amends and signs off every report.

In development · early access

What it does

From environmental data to a draft report

  1. Input

    Environmental data report

    An Envirocheck or Groundsure report for the site, plus walkover information.

  2. Process

    Drafted to the LCRM structure

    The report is assembled section by section, following the Environment Agency's Stage 1 guidance.

  3. Output

    Editable Word report

    A draft ready for professional review, amendment and sign-off.

Built on the guidance

Follows the LCRM Stage 1 structure

AutoReport follows the structure of the Environment Agency's LCRM: Stage 1 risk assessment, from site setting through to an initial conceptual site model and a qualitative risk assessment.

  1. 01Site setting
  2. 02Site history
  3. 03Geology and hydrogeology
  4. 04Source–pathway–receptor analysis
  5. 05Initial conceptual site model
  6. 06Qualitative risk assessment

Professional responsibility

A competent person signs off every report

LCRM requires risk assessments to be carried out by a competent person. AutoReport produces a draft. A competent assessor reviews, amends and signs off every report, and professional responsibility for the assessment stays with them.

AutoReport uses AI to help draft the report from the environmental data and walkover information supplied. The draft is a starting point: the assessor's review and sign-off are what make it a report.

Hosting and access

Secure and hosted for you

  • Hosted by IDS on Microsoft Azure.
  • Sign in with a Microsoft or Google account.
  • Access limited to authorised users.

Register interest in early access

Tier 1 AutoReport is in development. Tell us about your desk study work and we'll be in touch.